Home Bulletin detail

Wascosa Delivers 20 Ballast Wagons to Rail Cargo Group for Infrastructure Projects

2024-12-28 02:00

Wedoany.com Report-Dec 28, The wagons are intended to support railway infrastructure projects, offering operational features tailored for precise material dosing and increased safety during construction activities.

Wascosa has completed the delivery of 20 FANPS 2.0 radio-controlled ballast wagons to Rail Cargo Group. These wagons are equipped with six discharge drums and three hoppers, all operable via remote control. This functionality enables precise and flexible unloading of materials, contributing to improved efficiency in track construction and maintenance tasks. Additionally, the wagons include integrated lighting systems designed to ensure visibility during nighttime operations.

To address health and environmental concerns, the wagons incorporate an anti-dust water spray system aimed at reducing airborne particles during unloading. Noise reduction measures are also implemented to minimize operational disruptions in sensitive areas.

These wagons are also designed for tunnel operations, offering features that enhance safety and operational precision in confined spaces.

Further technical refinements were finalized during an on-site inspection at the manufacturing facility ahead of delivery.

Wascosa, active across more than 20 European countries, manages a fleet exceeding 22,000 freight wagons, serving a diverse customer base. The company's portfolio includes tank wagons, container wagons, pocket wagons for intermodal transport, and specialized wagons for bulk goods and infrastructure construction projects.

This newsletter is compiled and reprinted from the global Internet and strategic partner information, and it is only for readers' communication. If there are any infringements or other issues, please inform us timely, this site will be modified or deleted. Email: news@wedoany.com