Home Bulletin detail

Georgia Power Plans Additional Nuclear Capacity

2025-02-05 15:49

The four-unit Vogtle plant

Wedoany.com Report-Feb 5, Georgia Power has filed its 2025 Integrated Resource Plan, saying it has proposed power uprates at four units at its Hatch and Vogtle nuclear power plants and that additional nuclear power capacity will be needed over the long-term.

The 2025 Integrated Resource Plan (IRP) - filed on 31 January with the Georgia Public Service Commission (PSC) - details the company's plan to meet the energy needs of customers and support the state's expected continued extraordinary growth. In the plan, the company has proposed necessary investments in its generation fleet and transmission system to help ensure Georgia Power can continue to provide its customers with "the reliability and resiliency they deserve and expect, as well as demand-side and customer programmes".

Over the next six years, Georgia Power projects about 8200 MW of electrical load growth – an increase of more than 2200 MWe in peak demand by the end of 2030 when compared to projections in the 2023 IRP Update, which was approved by the Georgia PSC in April 2024.

The company said it has "identified opportunities to upgrade several of its existing nuclear units to provide additional capacity. This additional baseload energy can aid in meeting growing capacity needs without the need for incremental transmission system investment".

Georgia Power - a subsidiary of Southern Company - is proposing extended power uprates (EPU) upgrades at units 1 and 2 of its Vogtle nuclear power plant and units 1 and 2 at its Hatch plant. Between 2028 and 2034, it plans to add a total of an additional 112 MWe of capacity at the four units: 27 MWe each at Vogtle 1 and 2; 30 MWe at Hatch 1 and 28 MWe at Hatch.

Extended power uprates involve significant modifications to major plant equipment to increase the thermal output of the reactor. "The EPU process includes an extensive analysis of plant systems and components to verify the capability and identify needed modifications to support the power upgrade at each facility," Georgia Power said.

For the Hatch units, the company is also planning to complete a necessary upgrade to boiler water reactors (BWRs) called the 'Maximum Extended Load Line Limit (MELLA+)' enhancement. This increases capacity by allowing for higher thermal power without increasing core flow to support EPU for BWRs. In addition to the upgrades described above, the company is considering an option for Vogtle units 1 and 2 that would transition the outage window to a 24-month cycle. This upgrade would extend unit runtimes and decrease the number of refueling outages across the fleet.

Georgia Power said it is working with the US Nuclear Regulatory Commission (NRC) as a part of the required review and licensing process. The NRC will review the licence amendment request that contains the detailed analysis to support the power upgrades and concur with approval to allow the upgrade of each facility.

Nuclear new build possible

"The company believes that additional nuclear power will be needed over the long-term to reliably and economically serve the energy needs of its customers," Georgia Power said. "Similarly, nuclear power provides a long-term pathway to reduce carbon emissions and mitigate the cost pressures that potential future environmental regulations could impose on the existing fossil-fired fleet and future new fossil resources."

The company said it develops "multiple views of future cost and performance of generating technologies, multiple views of future electricity consumption, and multiple views of the future price of fuels to support expansion planning for future years of need. Accordingly, B2025 scenarios select nuclear generation in six of nine scenarios over the 20-year planning horizon and as early as 2037."

However, it says: "Even with new nuclear generation's numerous benefits, undertaking the construction of new nuclear generation carries substantial risks for all stakeholders involved. Before proposing additional new nuclear generation, the company believes that solutions must be developed to adequately balance and mitigate risks to stakeholders."

It adds that "preserving viable new nuclear generation options for the benefit of customers is a priority" for the company. Accordingly, it continues to perform in-depth assessments of potential project sites, evaluate available and emerging technologies, and engage with stakeholders in developing improved methods to deploy new nuclear generation projects. "Over the long-term, with adequate additional risk mitigations and leveraging the experience gained with Vogtle units 3-4, the company believes customers would benefit from additional new nuclear in the future."

"At Georgia Power, our vision extends far beyond today - we plan for tomorrow, the next ten years and decades to come," said Kim Greene, chairman, president and CEO of Georgia Power. "As Georgia continues to grow, this state is well-positioned for the future thanks to proactive planning, policies, and processes like the Integrated Resource Plan. The 2025 IRP provides a comprehensive plan to support Georgia's continued economic growth and serve Georgians with clean, safe, reliable and affordable energy well into the future."

This newsletter is compiled and reprinted from the global Internet and strategic partner information, and it is only for readers' communication. If there are any infringements or other issues, please inform us timely, this site will be modified or deleted. Email: news@wedoany.com
Negotiable
Combustible Gas Alarm Controller 1000N
Negotiable
Centrifugal chiller for third generation nuclear power AP/CAP series
Negotiable
Car charging supercapacitor battery 12V100Ah 12V50Ah long-life replacement battery, etc.
Negotiable
Does the cold winter make your car unable to start? This palm sized product can help your car HOT export starting power supply 16V for new energy vehicles, two wheeled tricycles, providing assistance in starting your beloved car in winter, 2000F
Negotiable
Jin Haiyan® Nuclear Island Special Glass Wool (JHY-NW)
Negotiable
6000mAh super capacitor battery 21700 electronic spray 4.2V6000F electric logistics vehicle electric two wheeled tricycle battery flashlight electric toy car
Negotiable
4.2V supercapacitor battery 2000F electric vehicle can be used about 20000 times. Application scenarios can be selected and customized
Negotiable
Original factory direct sales energy storage group 3.6V2000F graphene supercapacitor 2.7V 3000F Farad supercapacitor 18650 guide needle
Negotiable
186500S flat top rechargeable battery 4000mAh graphene supercapacitor battery 3.6V charging power supply
Negotiable
48V51.2V200ah10kw 15 degree household solar photovoltaic supercapacitor battery energy storage wall mounted supercapacitor battery
Negotiable
Graphene supercapacitor battery 4.4V emergency start 4000F energy storage cell soft pack super start power supply
Negotiable
18650 Capacitor Battery 2500mAh 2.7V 3.7V 4.2V 3000mAh Outdoor Charging Refrigerator Safety Protection and Other Applications Wide Power Nuclear New Energy Supercapacitors Supercapacitors Supercapacitors 18650
Negotiable
GHenergy Graphene 3.0V Supercapacitors 3000F Bolt Cylindrical Start up Energy Storage Power Supply Photovoltaic Energy Storage Used Over 100000 Times
Negotiable
GHenergy drone super battery 4.2V4000F, extended range, fully charged energy storage power supply, agricultural drone inspection drone aerial photography drone 18650 supercapacitor
Negotiable
Graphene supercapacitor 3.6V, small size 2000F, large capacity, low temperature resistance, non motor vehicle charging, new energy emergency charging customization, etc
Negotiable
3.0V graphene supercapacitor 500F supercapacitor power battery, super safe, ultra long battery life
1425 1425USD/PCS/sample
Safe, efficient, intelligent energy storage, creating smart homes and making life more convenient# Home Energy Storage # Supercapacitors # Energy Storage # Wall Mounted # Safe Electricity Use
Negotiable
Intelligent mowing robot