Home Bulletin detail

Blue Biofuels And GMP To Engineer And Design Cellulosic Ethanol Production Facility

2024-11-18 14:03

Wedoany.com Report-Nov 18, Blue Biofuels, a pioneer in the renewable energy sector, has officially contracted with the engineering firm, Global Management Partners (GMP), to produce front-end loading (FEL-2) level engineering plans for a production facility capable of producing 3 MMgpy (gallons per year) of biofuel from cellulosic biomass.

These plans will outline the specifics of how the facility will be built and operated. This planning stage is crucial for ensuring that the production facility can be constructed efficiently and at scale.

This milestone marks a major step in the company’s efforts to commercialize its proprietary Cellulose-to-Sugar (CTS) process, an innovative technology that converts agricultural waste and other biomass into renewable biofuels.

The development of the FEL-2 engineering plans will lay out the groundwork for constructing a state-of-the-art production facility, designed to showcase the scalability and efficiency of Blue Biofuels’ CTS technology.

Funding for this project is provided by the U.S. Department of Energy, through a Phase 2 grant awarded to the company earlier this year. The $1.15-MM grant will support the completion of these plans and help Blue Biofuels move closer to full-scale commercial production.

“We are thrilled to begin this crucial phase of our project and to partner with GMP to advance our engineering efforts,” said Ben Slager, CEO of Blue Biofuels. “With the support of the DOE and our commitment to innovation, we are confident that this production facility will serve as an additional confirmation of the scalability of our technology and helps to propel us into production of cellulosic biofuels to accelerate the transition to a more sustainable energy future.”

This newsletter is compiled and reprinted from the global Internet and strategic partner information, and it is only for readers' communication. If there are any infringements or other issues, please inform us timely, this site will be modified or deleted. Email: news@wedoany.com
Negotiable
Spiral plate heat exchanger
Negotiable
Shell and tube heat exchanger
Negotiable
Square fully welded heat exchanger
Negotiable
Cyclonic sand separator
Negotiable
Plate heat exchanger
Negotiable
Energy management and control center for oil and gas production enterprises
Negotiable
Cavitation-based closed-type air flotation system (tank-type)
Negotiable
Cavitation-based closed-type air flotation system (skid-mounted)
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Multifunctional oil, gas, and water treatment integrated system
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Three locals oil, gas, and water treatment integrated system
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Intelligent pulse dehydration integrated system
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Intelligent pulse water separation integrated system
Negotiable
AC low voltage three-phase asynchronous motor-YVFE4 series high-efficiency variable frequency speed control three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YVFE3 series variable frequency speed control three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YVFE2 series variable frequency speed control three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YE5 series ultra-high-efficiency three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YE4 series high-efficiency three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YE3 series three-phase asynchronous motor