Wedoany.com Report-Dec 10,Goldwind has announced the completion of the installation of 57 GW165-6.0MW turbines at the Lomas de Taltal Wind Farm in Chile's Atacama Desert.
The 342 MW project, located in the Antofagasta region, is the first in South America to utilise Goldwind's GW165-6.0MW units and is developed by Engie.