Home Bulletin detail

Empire Energy Receives Environmental Approval For Carpentaria Pilot

2024-11-16 15:19

Wedoany.com Report-Nov 16, Empire Energy Group Ltd. will increase activity at the Carpentaria Pilot Project in EP187 in Beetaloo basin, Australia, after the Northern Territory Department of Lands, Planning, and Environment granted approval for the environment management plan (EMP).

Up to four new well pads will be established, and up to nine new wells will be drilled, fractured, and completed. The Carpentaria gas plant (CGP), water handling station (WHS), and gas and water-wastewater flowlines will be installed, and operations and maintenance will be performed for up to 12 gas wells including the existing Carpentaria-2H and Carpentaria-3H wells, new and existing well pads, the CGP, WHS, gas and water-wastewater flowlines and camps. 

Gas will be transported through flowlines and the CGP to the McArthur River Pipeline for export to markets.

Following receipt of EMP approval, regulatory approval for the sale of gas under the Beneficial Use of Test Gas provisions of the NT Petroleum Act is the last remaining major approval required for the Carpentaria pilot project.

Carpentaria-5H drilling is expected to begin imminently (OGJ Online, Sept. 10, 2024). Ensign Rig #965 is now on location.

This newsletter is compiled and reprinted from the global Internet and strategic partner information, and it is only for readers' communication. If there are any infringements or other issues, please inform us timely, this site will be modified or deleted. Email: news@wedoany.com
Negotiable
Energy management and control center for oil and gas production enterprises
Negotiable
Cavitation-based closed-type air flotation system (tank-type)
Negotiable
Cavitation-based closed-type air flotation system (skid-mounted)
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Multifunctional oil, gas, and water treatment integrated system
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Three locals oil, gas, and water treatment integrated system
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Intelligent pulse dehydration integrated system
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Intelligent pulse water separation integrated system
Negotiable
AC low voltage three-phase asynchronous motor-YVFE4 series high-efficiency variable frequency speed control three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YVFE3 series variable frequency speed control three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YVFE2 series variable frequency speed control three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YE5 series ultra-high-efficiency three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YE4 series high-efficiency three-phase asynchronous motor
Negotiable
AC low voltage three-phase asynchronous motor-YE3 series three-phase asynchronous motor
Negotiable
Laser Household Combustible Gas Detector
Negotiable
Household Natural Gas Detector CH4
Negotiable
6000mAh super capacitor battery 21700 electronic spray 4.2V6000F electric logistics vehicle electric two wheeled tricycle battery flashlight electric toy car
Negotiable
Square and Round Digital Instruments
Negotiable
Compact Digital Instrument