The CGYJ-24/4.5Y Mine Track Beam Auxiliary Installation Vehicle is primarily used for the installation of single-rail track beams, re-drilling of anchor rods and cables, pipeline installation and maintenance, and other operations. It can significantly reduce the labor intensity of workers and improve work efficiency.
Product Introduction:
The CGYJ-24/4.5Y Mine Track Beam Auxiliary Installation Vehicle is primarily used for the installation of single-rail track beams, re-drilling of anchor rods and cables, pipeline installation and maintenance, and other operations. It can significantly reduce the labor intensity of workers and improve work efficiency.
Technical Features:
Equipped with a spacious, independent lift platform, with a beam storage compartment and lifting mechanical arm on the upper part, facilitating the lifting and installation of track beams, effectively reducing labor intensity and improving construction efficiency.
The anchor rod drilling machine can drill holes at any angle. The hydraulic system uses a load-sensitive variable pump with a proportional valve, which reduces energy consumption and heat generation, while intelligently distributing power. The drilling machine has a torque of 350N·m, a speed of 500r/min, ensuring high drilling efficiency.
The drilling machine is equipped with a hydraulic chuck and tightening device, which can quickly remove the drill rods by reversing the drill box with the operation handle, reducing worker labor intensity.
The operation of the installation vehicle, including the walking mechanism, front support legs, and rear support legs, is all controlled remotely, ensuring safe and convenient operation.
The equipment has a width of about 1.2 meters, with strong adaptability, and can be used with various tunneling equipment.