The landing joint is lowered into the well with the completion string to provide a precise landing position for the downhole flow control tool. When completing the well, any number of landing joints can be lowered into the string in order from large to small inner diameters as needed. In this way, any position in the string can be provided to seat and lock the downhole flow control tool.
The landing joint is lowered into the well with the completion string to provide a precise landing position for the downhole flow control tool. When completing the well, any number of landing joints can be lowered into the string in order from large to small inner diameters as needed. In this way, any position in the string can be provided to seat and lock the downhole flow control tool.
The flow control tool and the matching locking mandrel are lowered into the well together with the running tool carried by the wire. The wire operator selects the corresponding running tool, and this running process does not require well killing.
Product Features: