  1. Large equipment hoisting and transportation project for Zhejiang Petrochemical’s 40 million tons/year refining and chemical integration project:

There are 1,781 lifting equipments with a weight of 465,551 tons;

3,348 units were unloaded at the terminal, weighing 305,988 tons;

273,000 square meters of foundation treatment;

Invest major resources:

5000T portal hydraulic lifting system, XGC88000 (4000 tons);

X G C 2 8 0 0 0 (2 0 0 0 tons), C C 8 8 0 0 - 1 (1 6 0 0 tons),

C C 8 8 0 0 ( 1 2 5 0 tons) ;

M 2 1 0 0 0 (1 0 0 0 tons) , X G C 1 2 0 0 0 (8 0 0 tons) ,

QU Y 7 0 0 (7 0 0 tons) , L R 1 4 0 0 (4 0 0 tons);

  1. Unloading of ethylene cracking furnace module terminal:

(1) Equipment parameters: 27, 8 0 0 mm × 3, 8 10 mm × 3, 4 3 3 mm

(2) Unloading weight: 220 tons

(3) Mechanical resources: 800-ton mast crane

 

  1. Unloading at the dock of electric desalination tank

(1) Equipment parameters: 5,600mm×37,500mm

(2) Unloading weight: 298 tons

(3) Mechanical resources: 800-ton mast crane

   3.Pressure reduction tower hoisting:

(1) Equipment parameters: 6, 0 0 0 mm / 1 1, 6 0 0 mm / 6, 4 0 0 mm × 5 8, 1 7 3 mm

(2) Hoisting weight: 896 tons

(3) Mechanical resources: 2000-ton crawler crane (reinforced arm), 1250-ton crawler crane

 

Sinopec Heavy Lifting and Transportation Engineering Co., Ltd. 北京 北京市
  • Building 1, No. 6, Huixin East Street, Chaoyang District, Beijing
  • China
  • +8617801607507
Corporate homepage
Other products of the company More>